Skip to content

CURATORIAL PROPOSALS FOR INSTITUTIONS Museum Projects

These proposals are developed in close consultation with curatorial teams and adapted to the specific context, history, and programme of each institution.

01

INSTITUTIONAL PROJECTS

Living Collection

A collection of generative works that continues to evolve beyond the moment of acquisition. Visitors encounter a different exhibition each time. Not because the works have been exchanged, but because the system itself is alive.

Collection
Process
Temporal
Generative Systems

„Can a museum collect a behaviour? What does it mean to acquire a system rather than a singular object?“

02

INSTITUTIONAL PROJECTS

System as Artwork

The process of generation becomes visible. The algorithm is the artwork — individual images are only momentary states of an ongoing computation. The institution exhibits not a product, but a logic.

Authorship
Algorithm
Transparency
Generative Systems

„Where does authorship reside when the image is the result of a collaboration between human intention and machine logic?“

03

INSTITUTIONAL PROJECTS

Physical Manifestations

Digital originals enter physical space as large-format prints, light objects, or architectural installations. The exhibition explores the translation between medium; what survives the move from screen to surface, what is inevitably lost.

Digital / Physical
Installation
Scale
Medium

„How does a digital original manifest in physical space — and what is gained or lost in that transition?“

04

INSTITUTIONAL PROJECTS

Participatory Generation

Visitors influence the emergence of works. Their presence, movement, or choices become inputs to the generative system — they do not merely observe but participate in the construction of the image. The boundary between audience and author dissolves.

Participation
Interaction
Co-Authorship
Community

„What happens to the concept of the audience when visitors become part of the system that produces the work?“

Start

a conversation

Selected projects are currently in discussion with institutions across the world.

Creator of generative systems for art, space and strucuture.